Projects
Home / Application / Projects / Jiangsu 110MW/193MWh Energy Storage Power Station System Integration Project

Jiangsu 110MW/193MWh Energy Storage Power Station System Integration Project

Release time:Mar. 28, 2023

Project Type: Grid Side Energy Storage

Energy storage system: including the energy storage body and the 220 kV system station (and booster station), the energy storage body includes three parts: centralized, cascade utilization, and mobile energy storage power station

Investor: Invested by the grid, it is the second batch of grid-side energy storage projects in Jiangsu


Provide 500,000 kwh of electricity during the peak period of electricity consumption every day, meeting the electricity consumption of 220,000 residents

The stored electric energy is equivalent to the power generation of a 250,000-kilowatt medium-sized power plant for one hour, enough for 130 households to use for a year


Jiangsu 110MW/193MWh Energy Storage Power Station System Integration Project