We respect your privacy. Please consent to all cookies when you visit our website. Refer to our "Privacy Policy" for more information on how we handle personal data.

22-1 Japan (1).jpg

Japan

  • Power/Capacity Ratio
    373 MW / 745 MWh
  • Project Type
    Kasai City, Hyogo Prefecture 2 MW/8 MWh Project
    Gokan, Gunma Prefecture 2 MW/8 MWh Project
    Asama Town, Mie Prefecture 2 MW/8 MWh Project
    Ueno, Tokyo 2 MW/8 MWh Project

Highlights

  • Starting from 2024, Leveraging its in-depth knowledge of Japan’s BESS capacity market and power-regulation mechanisms. RelyEZ has pioneered and led totaling 745 MWh BESS projects, and a total investment of approximately US$260.5 million. Covering the full value chain from development, construction and equipment supply to grid-connection testing and long-term O&M. During project execution, RelyEZ will draw on strong local-partnership capabilities and whole-life-cycle operating experience to systematically solve multi-vendor and multi-regime integration challenges, delivering Japanese customers a stable, reliable and continuously optimized energy storage solution.
  • Millisecond-level response and precise control to participate in frequency regulation services for revenue
  • Acts as a flexible grid regulation resource to support power supply-demand balance
  • Modular design ensures safety and reduces operation and maintenance costs

Solutions

VenturePro Fusion Energy Storage System

download.jpg